Ace Coffee Bar Inc.

August 19, 2010 · Fail
🪳cooked
  • official resultFail
  • resultFail
  • inspection typeCanvass
  • failed findings5
  • critical findings0

← Back to the current restaurant page

Failed findings

  • cold food not cold enough
    Official wording: Dish Machines: Provided With Accurate Thermometers, Chemical Test Kits And Suitable Gauge Cock
    Inspector note: GAUGE COCK AT DISH MACHINE NOT WORKING. MUST REPAIR SAME.
    code 22
  • Floors: Constructed Per Code, Cleaned, Good Repair, Coving Installed, Dust-Less Cleaning Methods Used
    Inspector note: DETAIL CLEAN FLOORS THROUGHOUT. REMOVING ALL CONSTRUCTION DEBRIS FROM FLOORS. SOME NEW FLOORS ORE BEING PUT IN ON 1FT FLOOR.
    code 34
  • Walls, Ceilings, Attached Equipment Constructed Per Code: Good Repair, Surfaces Clean And Dust-Less Cleaning Methods
    Inspector note: REPLACE ALL WATER STAINED, MISSING CEILING TILES THROUGHOUT. SEAL ALL HOLES, OPENINGS AROUND PIPES, CRACKS, CREVICES, LOOSE TILES(FLOOR & WALL). SECURE ALL HAND SINKS TO WALLS.
    code 35
  • pests in the house
    Official wording: Ventilation: Rooms And Equipment Vented As Required: Plumbing: Installed And Maintained
    Inspector note: PROVIDE EXPOSED HANDSINKS (HANDWASHING SINKS)IN KITCHEN AREAS. REPAIR ELECTRICAL VENTILATION SYSTEM IN ALL WASHROOMS THROUGHOUT.
    code 38
  • grimy wiping cloths
    Official wording: Premises Maintained Free Of Litter, Unnecessary Articles, Cleaning Equipment Properly Stored
    Inspector note: REMOVE ALL CONSTRUCTION MATERIALS WHEN CONSTRUCTION IS COMPLETE. i.e. NEW AIR CONDITIONER, NEW FLOORS, NEW LAUNDRY ROOM, NEW RECEPTION DESK/AREA, UPDATING PREMISES.
    code 41

Browse this restaurant's inspections

About this record

This record comes from Chicago Department of Public Health. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Chicago Data Portal.

official city health-inspection data · no account, no sign-up