Bp/Subway

June 9, 2011 · Pass
😇clean
  • official resultPass
  • resultPass
  • inspection typeCanvass
  • failed findings4
  • critical findings0

← Back to the current restaurant page

Failed findings

  • Floors: Constructed Per Code, Cleaned, Good Repair, Coving Installed, Dust-Less Cleaning Methods Used
    Inspector note: The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. SOME FLOOR TILES IN THE STORE SECTION ARE BROKEN AND SOME ARE MISSING. INSTRUCTED TO REPLACE.
    code 34
  • Walls, Ceilings, Attached Equipment Constructed Per Code: Good Repair, Surfaces Clean And Dust-Less Cleaning Methods
    Inspector note: The walls and ceilings shall be in good repair and easily cleaned. CLEAN THE CEILING AND WALLS IN THE WALKIN COOLER.
    code 35
  • thermometers missing
    Official wording: Lighting: Required Minimum Foot-Candles Of Light Provided, Fixtures Shielded
    Inspector note: All rooms in which food or drink is prepared, or in which utensils are washed, shall be lighted so that a minimum of 50-foot candles of light is available on all work surfaces. CLEAN THE LIGHT SHIELDS IN THE SUBWAY SIDE HAS DUST BUILDUP.;
    code 36
  • pests in the house
    Official wording: Ventilation: Rooms And Equipment Vented As Required: Plumbing: Installed And Maintained
    Inspector note: The flow of air discharged from kitchen fans shall always be through a duct to a point above the roofline. CLEAN ALL THE VENTS THROUGHOUT PREMISES HAS DUST AND DIRT ON THEM.
    code 38

What changed since the previous inspection?

Compared with Pass on April 19, 2010: 3 findings appeared for the first time. 1 finding recurred.

Browse this restaurant's inspections

About this record

This record comes from Chicago Department of Public Health. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Chicago Data Portal.

official city health-inspection data · no account, no sign-up