✓
Cba
June 12, 2017 · Pass
😇clean
- official resultPass
- resultPass
- inspection typeCanvass Re-Inspection
- failed findings4
- critical findings0
Failed findings
-
Food And Non-Food Contact Surfaces Properly Designed, Constructed And MaintainedInspector note: FOUND PUDDLES OF WATER ON THE BOTTOM SHELF OF THE 2DR REFRIGERATOR AT THE FRONT PREP AREA. INSTRUCTED TO REPAIR AND MAINTAIN ABOVE STATED REFRIGERATOR.
-
Floors: Constructed Per Code, Cleaned, Good Repair, Coving Installed, Dust-Less Cleaning Methods UsedInspector note: FOUND AN UNEVEN FLOOR UNDER THE REAR 1-COMP PREP SINK IN THE REAR AREA NEXT TO THE 3-COMP SINK. INSTRUCTED TO REPAIR SO AS TO HAVE FLOOR SMOOTH AND EASILY CLEANABLE.
-
pests in the houseOfficial wording: Ventilation: Rooms And Equipment Vented As Required: Plumbing: Installed And MaintainedInspector note: MUST REPAIR LEAK UNDER THE COCA-COLA DISPINSING/ICE MACHINE LOCATED IN THE CUSTOMER DINING AREA CAUSING LARGE PUDDLE OF WATER AT COUNTER TOP.INSTRUCTED TO REPAIR LEAK AND MAINTAIN COUNTER TOPS DRY.
-
Food Handler Requirements MetInspector note: FOUND 3 FOOD PREP STAFF MEMBERS WITHOUT THEIR IDPH FOOD HANDLER'S CERTIFICATES. ALL NEW AND EXISTING FOOD PREP STAFF MEMBERS MUST OBTAIN THEIR HAVE THEIR IDPH FOOD HANDLER'S CERTIFICATES WITHIN 30 DAYS OF HIRE.
What changed since the previous inspection?
Compared with Fail on June 2, 2017: 4 findings recurred. 2 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in Loop
About this record
This record comes from Chicago Department of Public Health. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Chicago Data Portal.