✕
El Rey Del Maiz
August 8, 2018 · Fail
🪳cooked
- official resultFail
- resultFail
- inspection typeLicense Re-Inspection
- failed findings5
- critical findings0
Failed findings
-
surfaces / setup not up to codeOfficial wording: Food & Non-Food Contact Surfaces Cleanable, Properly Designed, Constructed & UsedInspector note: MUST PROVIDE SINK STOPPERS FOR THREE COMPARTMENT SINK.
-
Warewashing Facilities: Installed, Maintained & Used; Test StripsInspector note: MUST PROVIDE A WRITTEN DETAILED CLEANING PROCEDURE FOR ALL FOOD-CONTACT EQUIPMENT THAT IS TOO LARGE TO BE SUBMERGED IN THE THREE COMPARTMENT SINK; INCLUDING THE SEMI-COOKING TUB, SOAKING/CLEANING OF CORN TUB, LARGE GRINDER, AND ROLLING TRANSPORT CART. MUST SUBMIT PROCEDURE TO CDPH AT FOOD@CITYOFCHICAGO.ORG FOR APPROVAL. PRIORITY FOUNDATION VIOLATION#: 7-38-025 NO CITATION ISSUED. PLEASE NOTE:(B) Sink compartments shall be large enough to accommodate immersion of the largest EQUIPMENT and UTENSILS. If EQUIPMENT or UTENSILS are too large for the WAREWASHING sink, a WAREWASHING machine or alternative EQUIPMENT as specified in Paragraph (C) of this section shall be used. Pf (C) Alternative manual WAREWASHING EQUIPMENT may be used when there are special cleaning needs or constraints and its use is APPROVED. Alternative manual WAREWASHING EQUIPMENT may include: (1) High-pressure detergent sprayers; (2) Low- or line-pressure spray detergent foamers; (3) Other task-specific cleaning EQUIPMENT; (4) Brushes or other implements;
-
Sewage & Waste Water Properly DisposedInspector note: OBSERVED FLOOR DRAIN OF FACILITY DRAINING INTO A LARGE BUCKET IN THE BASEMENT WITH A SUMP PUMP INSIDE THE BUCKET. MUST PROVIDE A PLUMBING AND DRAINAGE SYSTEM, APPROVED BY THE CHICAGO DEPARTMENT OF BUILDINGS, PLUMBING SECTOR. PRIORITY VIOLATION#: 7-38-030(C),NO CITATION ISSUED.
-
floors, walls, or ceilings grimyOfficial wording: Physical Facilities Installed, Maintained & CleanInspector note: MUST REMOVE ALL UNUSED EQUIPMENT IN THE REAR PREP AREA. MUST REMOVE ALL CLUTTER AND UNNECESSARY ITEMS IN THE BASEMENT/HOT WATER TANK LOCATION; ORGANIZE, AND MAINTAIN AREAS. • MUST SEAL ALL GAPS AND OPENINGS IN THE WALLS, FLOOR, AND CEILING IN THE FURNACE CLOSET, BY THE PIPING IN THE WALLS, AND IN THE BASEMENT. • MUST PROVIDE A 4" FLOOR COVING IN PREP AREAS THAT IS A NON-POROUS, CORROSION-RESISTANT, SMOOTH, EASILY CLEANABLE SURFACE.
-
Adequate Ventilation & Lighting; Designated Areas UsedInspector note: MUST PROVIDE AN ADEQUATE VENTILATION HOOD FOR THE FOOD EQUIPMENT UNIT THAT IS USED TO PARTIAL COOK THE MAIZ/CORN.
What changed since the previous inspection?
Compared with Fail on July 24, 2018: 5 findings recurred. 7 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in Belmont Cragin
About this record
This record comes from Chicago Department of Public Health. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Chicago Data Portal.