✕
Fat Lee Supermarket
June 19, 2013 · Fail
🪳cooked
- official resultFail
- resultFail
- inspection typeLicense
- failed findings7
- critical findings1
Failed findings
-
water/temperature at the sink offcriticalOfficial wording: Water Source: Safe, Hot & Cold Under City PressureInspector note: MUST HAVE HOT WATER ON PREMISES PER CITY CODE.
-
Dish Washing Facilities: Properly Designed, Constructed, Maintained, Installed, Located And OperatedInspector note: MUST INSTALL A 3-COMPARTMENT SINK WITH HOT AND COLD RUNNING WATER PER CITY CODE THAT THE BIGGEST UTENSIL CAN BE SUBMERGED INTO THE COMPARTMENTS FOR PROPER WASH, RINSING AND SANITIZING. IT MUST HAVE A METAL DRAINBOARD ATTACHED TO IT AND STOPPERS.
-
Food And Non-Food Contact Surfaces Properly Designed, Constructed And MaintainedInspector note: MUST PROVIDE A PARTITIONER/SPLASH GUARD TO SEPARATE 2-COMP. SINK FROM PREP TABLE.
-
Floors: Constructed Per Code, Cleaned, Good Repair, Coving Installed, Dust-Less Cleaning Methods UsedInspector note: MUST DRY FLOORS IN BASEMENT.
-
Walls, Ceilings, Attached Equipment Constructed Per Code: Good Repair, Surfaces Clean And Dust-Less Cleaning MethodsInspector note: MUST FIX WALLS IN REAR STORAGE AREA THAT ARE IN POOR REPAIR AND IS NOT SMOOTH AND EASILY CLEANABLE.
-
pests in the houseOfficial wording: Ventilation: Rooms And Equipment Vented As Required: Plumbing: Installed And MaintainedInspector note: PIPES LEAKING IN BASEMENT, MUST FIX.
-
Refrigeration And Metal Stem Thermometers Provided And ConspicuousInspector note: MUST PROVIDE INTERNAL THERMOMETERS TO ALL COOLERS.
Browse this restaurant's inspections
More restaurants in Armour Square
About this record
This record comes from Chicago Department of Public Health. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Chicago Data Portal.