✓
Portage Theater
November 16, 2017 · Pass
😇clean
- official resultPass
- resultPass
- inspection typeCanvass Re-Inspection
- failed findings3
- critical findings0
Failed findings
-
Walls, Ceilings, Attached Equipment Constructed Per Code: Good Repair, Surfaces Clean And Dust-Less Cleaning MethodsInspector note: PEELING PAINT ON THE WALLS IN THE DISH WASHING AREA. MUST SCRAPE PEELING PAINT AND RE PAINT. CRACKED CEILING IN THE FRONT ABOVE THE POP CORN MACHINE AND PIZZA HOT HOLDING UNIT. MUST REPAIR AND MAINTAIN.
-
thermometers missingOfficial wording: Lighting: Required Minimum Foot-Candles Of Light Provided, Fixtures ShieldedInspector note: MUST PROVIDE LIGHT SHIELD OR REPLACE WITH SHATTERED LIGHT BULB ABOVE THE PREP TABLE IN THE PREP AREA AND MAINTAIN.
-
pests in the houseOfficial wording: Ventilation: Rooms And Equipment Vented As Required: Plumbing: Installed And MaintainedInspector note: HEAVY LEAK ON THE FAUCET HOT AND COLD HANDLE OF THE 3 COMPT SINK AND PIPE UNDER THE 3 COMPT SINK. MUST REPAIR TO STOP THE LEAK.
What changed since the previous inspection?
Compared with Fail on November 8, 2017: 3 findings recurred. 4 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in Portage Park
About this record
This record comes from Chicago Department of Public Health. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Chicago Data Portal.