Starbucks

December 8, 2010 · Pass
😇clean
  • official resultPass
  • resultPass
  • inspection typeCanvass
  • failed findings1
  • critical findings0

← Back to the current restaurant page

Failed findings

  • Floors: Constructed Per Code, Cleaned, Good Repair, Coving Installed, Dust-Less Cleaning Methods Used
    Inspector note: The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. MUST CLEAN IN DETAIL THE FLOOR ALONG THE WALL BASE AND ALL CORNERS BEHIND THE COOLERS IN THE FRONT COUNTER AND MAINTAIN. MUST CLEAN IN DETAIL THE FLOOR UNDER ALL THE COOLERS AND PALLETS AND SHELVINGS IN THE DRY STORAGE ROOM,( WITH DEBRIS).
    code 34

Browse this restaurant's inspections

About this record

This record comes from Chicago Department of Public Health. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Chicago Data Portal.

official city health-inspection data · no account, no sign-up