✕
Cafenation
May 1, 2026 · Fail
🪳cooked
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings2
- critical findings1
Failed findings
-
Backflow Prevention (P)criticalInspector note: At the designated food prep sink there is a direct connection to the waste water system; have a licensed plumber pull proper permits and install an indirect connection (air gap) at the prep sink.
-
Repairing-Premises Structures Attachments and Fixtures-Methods (C)Inspector note: In the employee restroom there are multiple missing and damaged ceiling tiles; repair or replace the ceiling tiles.
Checks marked passed
-
Good Repair and Proper Adjustment-Equipment (C)Inspector note: Observed multiple damaged gaskets at cold holding units; repair or replace damaged gaskets.
What changed since the previous inspection?
Compared with Fail on April 17, 2026: 2 findings recurred. 1 previous finding did not recur.
Browse this restaurant's inspections
More restaurants in Brighton
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.