✕
Dani's Queer Bar
October 22, 2026 · Fail
mid
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings1
- critical findings0
Failed findings
-
Floors Walls and Ceilings Utility Lines (C)Inspector note: Observed at the downstairs and first floor bar area that directly above the bar there are exposed utility lines; utility lines should be enclosed to prevent possible contamination and not hinder proper cleaning of the ceiling. 10-22-2026: The establishment requested a Health Inspector to inspect the renovated basement bar area. The signed plan review shows that the utility pipes lines and HVAC were to be enclosed but they are still exposed. Provide enclosed HVAC utility lines and pipes.
What changed since the previous inspection?
Compared with Fail on September 9, 2026: 1 finding recurred.
Browse this restaurant's inspections
More restaurants in Back Bay
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.