✕
Douzo Japanese Restaurant
November 6, 2019 · Fail
😬mid
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings2
- critical findings0
Failed findings
-
Cutting Surfaces (C)Inspector note: resurface worn white cutting boards
-
(A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)Inspector note: repair gauges to dishmachine provide 160 strips
Checks marked passed
-
Packaged and Unpackaged Food-Separation Packaging and Segregation (P)criticalInspector note: sushi/properly store all raw foods
-
(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)criticalInspector note: sushi/sliced avacado 52/shrimp 53 degrees kitchen/sliced tomato 46 degrees
-
Ready-To-Eat Time/Temperature Control for Safety Food Date Marking (Pf)Inspector note: provide proper date marking for all tcs foods
-
Cooling Heating and Holding Capacities-Equipment (Pf)Inspector note: sushi/repair display case to operate at 41 degrees or below
-
Temperature Measuring Devices Manual and Mechanical Warewashing (Pf)Inspector note: high temp/provide 160 strips or irreversible mechanical thermometer high temp/repair/replace gauges
-
Temperature Measuring Devices-Functionality (C)Inspector note: provide internal thermometers to side sushi case and 1 door glass reach in
-
Maintaining Premises Unnecessary Items and Litter (C)Inspector note: outside storage cage/organize area/clean grounds/keep locked when not in use
-
Repairing-Premises Structures Attachments and Fixtures-Methods (C)Inspector note: defrost sushi reach in and wait station reach in remove items stored on top of ice machine
What changed since the previous inspection?
Compared with Fail on October 30, 2019: 1 finding appeared for the first time. 1 finding recurred. 8 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in South End
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.