Cooked?

Marseille

December 10, 2025 · Fail
😬mid
  • official resultFail
  • resultFail
  • inspection typeEating & Drinking
  • failed findings1
  • critical findings0

← Back to the current restaurant page

Failed findings

  • Handwashing Sinks Installation (Pf)
    Inspector note: Water at bakery area hand sink at 76F after multiple minutes. PIC stated boiler is currently being worked on. Hand sink should have water 100F or above.
    code 590.005/5-202.12-PF** · serious findingstatus: Fail

What changed since the previous inspection?

Compared with Pass on September 25, 2024: 1 finding appeared for the first time.

Browse this restaurant's inspections

About this record

This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Analyze Boston.

official city health-inspection data · no account, no sign-up