✕
Mixsum Bakery
December 26, 2025 · Fail
😬mid
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings7
- critical findings0
Failed findings
-
Clean-up of Vomiting and Diarrheal Events (Pf)Inspector note: At the time of the inspection there was no Vomit and diarreah clean up kit. Provide at the time of the re-inspection.
-
Wiping Cloths Use Limitation (C)Inspector note: Soiled wiping cloths observed being left out on counter tops. Discontinue and provide a proper sanitizing solution.
-
Nonfood-Contact Surfaces (C)Inspector note: Gaskets around the front flip top cooler damaged. Replace or repair.
-
Manual Warewashing Sink Compartment Requirements (C)Inspector note: Only 2 operational drain plugs of for the 3 bay sink. Address and provide all 3 in order to propely wash rinse and sanitize all equipment.
-
Nonfood Contact Surfaces (C)Inspector note: Storage shelves above the 3 bay sink with heavy grease build-up. Clean to remove. Floors under and around the stove top and Wok station with excess grease spills. Clean to remove. Surface of the 6 top burner with excess carbon build-up. Clean to remove. Exteriors of the large/small stand mixers visibly soiled. Clean to remove. Storage racks inside of the walk-in cooler visibly soiled. Clean to remove. Exterior of all bulk food bins with cacked on foods. Clean to remove. Floors located under and around preparation tables to be cleaned and free from any excess food spills.
-
Prohibitions (C)Inspector note: Small stand mixer observed being stored under the drainage pipe of the hand sink. Discontinue and store all equipment in a clean and protected manner.
-
Maintaining Premises Unnecessary Items and Litter (C)Inspector note: Back storage area located next to the restroom with excess boxes/containers. Address and remove all unecessary containers to allow for proper pest management.
Browse this restaurant's inspections
More restaurants in Downtown
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.