✓
Sam Lagrassa's
December 19, 2025 · Pass
😇clean
- official resultPass
- resultPass
- inspection typeEating & Drinking w/ Take Out
- failed findings0
- critical findings0
✓ No failed findings were recorded; 9 code checks were marked passed.
Checks marked passed
-
Sanitizing Solutions Testing Devices (Pf)Inspector note: No Sanitizer test trip observed for quat. provide
-
(A) Certified Food Protection Manager (C)Inspector note: Provide up to date certified food manager and allergen trained manager
-
Packaged and Unpackaged Food-Separation Packaging and Segregation (C)Inspector note: uncovered food ( Cooked mushroom cole slaw and slice tomatoes) observed inside the cold holding fridge . Cover all food items to prevent contamination( Corrected on site)
-
Food Preparation (C)Inspector note: There is no prep sink to wash produce lettuce is being pre- washed and tomato are currently being washed in the dishwasher sink. Provide a food prep sink to protect produce during preparation
-
Nonfood Contact Surfaces (C)Inspector note: Under counter cabinet observed with soils and dropping clean and sanitize to remove
-
Toilet Room Receptacle Covered (C)Inspector note: Women restroom trash observed without cover Provide trash receptacle with cover
-
Floors Walls and Ceilings-Cleanability (C)Inspector note: Front counter prep area kitchen floor observed with solis and debris. clean to remove
-
Handwashing Signage (C)Inspector note: Hand sink in the kitchen downstairs observed without signage. Provide
-
Controlling Pests (C)Inspector note: Evidence of rodent activity ( mouse droppings) was noted in multiple areas of the facitity Front counter kitchen downstairs . clean to remove./ Provide a detailed licensed exterminator’s report to keila.depina@boston.gov.
What changed since the previous inspection?
Compared with Fail on December 12, 2025: 9 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in Downtown
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.