✕
Tostado Llc
April 24, 2018 · Fail
😬mid
- official resultFail
- resultFail
- inspection typeEating & Drinking w/ Take Out
- failed findings3
- critical findings0
Failed findings
-
Food Contact Surfaces DesignInspector note: replace all scored cutting boards/replace residential ice cooler with nsf approved commercial cooler.
-
Non-Food Contact SurfacesInspector note: pepsi unit was 50F unit shall be 41F or below/replace all missing and defective doorgaskets.
-
Walls/Ceilings Designed Constructed InstalledInspector note: clean ceiling above cooking area/provide proper hood referred to fire dept/clean wall vent and loovers.
Checks marked passed
-
Location AccessiblecriticalInspector note: handsink shall be made accessible during food service and prep/donot block handsink.
-
Food Restrictions & Preparationcritical
-
PIC KnowledgecriticalInspector note: provide a fultime serve safe manager.
-
Consumer AdvisoriescriticalInspector note: provide allergin advisory and consumer advisory for all menus with reminder and disclosure.
-
Food ProtectionInspector note: all refrigeration shall be maintained at 41F or below.
-
Food Utensil StorageInspector note: remove all in use utensils from stagnant water.
-
Test Kit Provided
-
Wiping Cloths Clean SanitizeInspector note: properly store all wiping cloths in a sanitizer solution.
-
Toilet Enclosed CleanInspector note: clean vent cover in restroom.
-
Adequate Number Frequency Vermin ProofInspector note: provide covers for all trash receptacles...
-
Floors Designed Constructed InstalledInspector note: repair chipped floor tiles and replace missing floor grout.
-
Premises MaintainedInspector note: remove all beverage crates used for shelving and provide a maintenance rack for proper storage of mops and brooms.
What changed since the previous inspection?
Compared with Fail on April 17, 2018: 3 findings recurred. 12 previous findings did not recur.
Browse this restaurant's inspections
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.