✓
Coffee Break Cafe
September 29, 2010 · Pass
😇clean
- official resultPass
- resultPass
- inspection typeCanvass
- failed findings2
- critical findings0
Failed findings
-
Walls, Ceilings, Attached Equipment Constructed Per Code: Good Repair, Surfaces Clean And Dust-Less Cleaning MethodsInspector note: The walls and ceilings shall be in good repair and easily cleaned. SEAL OPENINGS AROUND PIPE FITTINGS UNDER REAR EXPOSED SINK. REPLACE STAINED CEILING TILES IN PREP AND DINING AREAS.
-
pests in the houseOfficial wording: Ventilation: Rooms And Equipment Vented As Required: Plumbing: Installed And MaintainedInspector note: REPAIR LEAKING DRAINPIPE UNDER 3-COMP SINK.
Browse this restaurant's inspections
More restaurants in Beverly
About this record
This record comes from Chicago Department of Public Health. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Chicago Data Portal.