✓
Parkway Ballroom
October 25, 2010 · Pass
😇clean
- official resultPass
- resultPass
- inspection typeCanvass
- failed findings2
- critical findings0
Failed findings
-
Floors: Constructed Per Code, Cleaned, Good Repair, Coving Installed, Dust-Less Cleaning Methods UsedInspector note: The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. MUST DETAIL CLEAN FLOORS IN PREP AREA UNDER COOLERS AND PREP TABLES AND REMOVE FOOD AND OTHER DEBRIS.
-
pests in the houseOfficial wording: Ventilation: Rooms And Equipment Vented As Required: Plumbing: Installed And MaintainedInspector note: Ventilation: All plumbing fixtures, such as toilets, sinks, washbasins, etc., must be adequately trapped, vented, and re-vented and properly connected to the sewer in accordance with the plumbing chapter of the Municipal Code of Chicago and the Rules and Regulations of the Board of Health. MUST PROVIDE HOT WATER AT ALL HAND SINKS IN THE EAST AND FRONT BALLROOM WASHROOMS WHERE MISSING. • Ventilation: All plumbing fixtures, such as toilets, sinks, washbasins, etc., must be adequately trapped, vented, and re-vented and properly connected to the sewer in accordance with the plumbing chapter of the Municipal Code of Chicago and the Rules and Regulations of the Board of Health. MUST PROVIDE THREE WORKING STOPPERS FOR ALL 3 COMPARTMENT SINKS ON SITE. MUST REPAIR LEAKY FAUCETS AT THE LARGE 3 COMPARTMENT SINK USED FOR DISHWASHING. MUST REPAIR LEAK AT TOILET BOWL FLUSH HANDLE IN MENS ROOM ADJACENT TO FRONT BALLROOM.
What changed since the previous inspection?
Compared with Fail on October 19, 2010: 2 findings appeared for the first time.
Browse this restaurant's inspections
More restaurants in Grand Boulevard
About this record
This record comes from Chicago Department of Public Health. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Chicago Data Portal.