The Coffee Studio

June 18, 2012 · Fail
🪳cooked
  • official resultFail
  • resultFail
  • inspection typeCanvass
  • failed findings4
  • critical findings0

← Back to the current restaurant page

Failed findings

  • Dish Washing Facilities: Properly Designed, Constructed, Maintained, Installed, Located And Operated
    Inspector note: THREE COMPARTMENT SINK NOT MAINTAINED. WASTE WATER IS BACKING UP AT MIDDLE AND LEFT COMPARTMENT SINKS WHEN WATER IS MECHANICALLY RELEASED AND WHEN WATER IS TURNED ON FROM FAUCET;ALSO IS EXTREMELY SLOWLY DRAINING .HIGH TEMP DISH MACHINE NOT OPERABLE HAS A SIGN POSTED NOT IN USE,MANAGER ALREADY SET AN APPOINTMENT WITH TECHNICIAN. INSTRUCTED TO CONTACT A PLUMBER FOR THE TREE COMPARTMENT SINKS. SERIOUS VIOLATION:7-38-030
    code 24
  • Food And Non-Food Contact Surfaces Properly Designed, Constructed And Maintained
    Inspector note: SPLASH GUARD IS NEEDED BETWEEN THE EXPOSED HAND SINK AND OPENED ICE CREAM CHEST FREEZER.
    code 32
  • Floors: Constructed Per Code, Cleaned, Good Repair, Coving Installed, Dust-Less Cleaning Methods Used
    Inspector note: SWEEP FLOOR IN BASEMENT STORAGE AREA. ELEVATE ITEMS 6" OFF THE FLOOR IN REAR STORAGE(WOOD AND CONSTRUCTION MATERIAL).
    code 34
  • pests in the house
    Official wording: Ventilation: Rooms And Equipment Vented As Required: Plumbing: Installed And Maintained
    Inspector note: REPAIR LEAKING WATER PIPE UNDER THE THREE COMPARTMENT SINK,LEFT SIDE.
    code 38

What changed since the previous inspection?

Compared with Pass on September 2, 2011: 3 findings appeared for the first time. 1 finding recurred. 4 previous findings did not recur.

Browse this restaurant's inspections

About this record

This record comes from Chicago Department of Public Health. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Chicago Data Portal.

official city health-inspection data · no account, no sign-up