Cooked?

Anshur Restauruant

May 17, 2011 · Fail
😬mid
  • official resultFail
  • resultFail
  • inspection typeEating & Drinking w/ Take Out
  • failed findings2
  • critical findings0

← Back to the current restaurant page

Failed findings

  • Dishwashng Facilities
    Inspector note: Repair dishmachine to meet temperature requirements per logo plate. Discontinue the use of ceramics until machine is repaired.
    code 16-4-501.11/.15* · lower-severity findingstatus: Fail
  • Fixture's not properly shielded
    Inspector note: Provide shatter proof bulbs for freezer and cold unit.
    code 38-6-202.11* · lower-severity findingstatus: Fail

Checks marked passed

  • PIC Performing Dutiescritical
    Inspector note: Post Allergen Advisory on menu board and paper menus.
    code M-2-103.11*** · critical food-safety factorstatus: Pass
  • Food Contact Surfaces Design
    Inspector note: Replace heavily scoreded cutting boards.
    code 14-4-202.11* · lower-severity findingstatus: Pass
  • Non-Food Contact Surfaces
    Inspector note: 2 door Salad Unit at 40F repair door gaskets.
    code 15-4-202.16* · lower-severity findingstatus: Pass
  • Non-Food Contact Surfaces Clean
    Inspector note: Clean mens restroom to remove odors.
    code 23-4-602.13* · lower-severity findingstatus: Pass
  • premises not properly maintained or cleaned
    Official wording: Improper Maintenance of Walls/Ceilings
    Inspector note: Repair exposed ceiling. • Reseal worn walls and stairs.
    code 37-6-501.11-.12* · lower-severity findingstatus: Pass

What changed since the previous inspection?

Compared with Fail on May 6, 2011: 2 findings recurred. 5 previous findings did not recur.

Browse this restaurant's inspections

About this record

This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Analyze Boston.

official city health-inspection data · no account, no sign-up