Cooked?

B.U. George Sherman Union

February 14, 2020 · Pass
😇clean
  • official resultPass
  • resultPass
  • inspection typeEating & Drinking
  • failed findings0
  • critical findings0
✓ No failed findings were recorded; 2 code checks were marked passed.

← Back to the current restaurant page

Checks marked passed

  • Mechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
    Inspector note: Final Rinse at high temp dish machine registered 121F. Repair to maintain 180F or above. Three Bay Sink will be used for final rinse until repairs take place.
    code 590.004/4-501.112-PF** · serious findingstatus: Pass
  • Cutting Surfaces (C)
    Inspector note: Some of the cutting boards heavily scored. Resurface or replace.
    code 590.004/4-501.12-C* · lower-severity findingstatus: Pass

What changed since the previous inspection?

Compared with Fail on February 7, 2020: 2 previous findings did not recur.

Browse this restaurant's inspections

About this record

This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Analyze Boston.

official city health-inspection data · no account, no sign-up