✓
Caffe Nero
October 2, 2026 · Pass
clean
- official resultPass
- resultPass
- inspection typeEating & Drinking
- failed findings0
- critical findings0
✓ No failed findings were recorded; 6 code checks were marked passed.
Checks marked passed
-
Discarding or Reconditioning Unsafe Adulterated or Contaminated Food (P)criticalInspector note: Multiple food items exposed to water due to ceiling leak were disposed prior to my arrival Denatured on site
-
(A)-(P) Person-In-Charge-Duties (Pf)Inspector note: Broken pipe in the unit above the establishment water damage through the ceiling throughout. Building GM on site along with plumbers to repair pipe Assistant Commissioner Dan Prendergast notified. Voluntary closure issued. PIC Instructed to provide all necessary repairs clean/sanitize/disinfect using a professional licensed restoration company provide all documentation be re-inspected by building electrical & health for approval to re-open.
-
(A) Ceasing Operations and Reporting (Pf)Inspector note: Water has been shut off to the establishment.Provide all necessary repairs
-
Nonfood Contact Surfaces (C)Inspector note: Clean/sanitize/disinfect all exposed equipment.counters.tables wares ect... Provide all cleaning documents be re-inspected for approval to re-open.
-
Floors Walls and Ceilings-Cleanability (C)Inspector note: Remove all stagnate water from the affected floors Clean/sanitize/disinfect the location throughout Provide all cleaning documentation to the Health Department.
-
Repairing-Premises Structures Attachments and Fixtures-Methods (C)Inspector note: Ceiling & light fixtures damaged from resulting water leak.Provide all necessary repairs as needed. Power to the dining room lights has been shut down
What changed since the previous inspection?
Compared with Closed by the city on September 20, 2026: 6 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in Allston
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.