✕
Dynasty
March 22, 2023 · Fail
😬mid
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings10
- critical findings0
Failed findings
-
(A)-(P) Person-In-Charge-Duties (Pf)Inspector note: 8-201.11 & 8-303.10 Built in Compliance with Approved Plans Kitchen build varies from approved plan for kitchen and basement. Changes made without Health or Building approval. Provide changes to Health and Building Departments for approval.
-
Consumption of Animal Foods that are Raw Undercooked or Not Otherwise Processed to Eliminate Pathogens (Pf)Inspector note: Provide menu with written/printed cooking instructions for hot pot customers
-
Temperature Measuring Devices-Functionality (Pf)Inspector note: Wash dial on dish machine not functioning. Replace as needed.
-
Temperature Measuring Devices Manual and Mechanical Warewashing (Pf)Inspector note: No irreversible thermometer or thermal strips for testing final rinse temperature of high temp diah machine. Provide either thermometer or strips.
-
Sanitizing Solutions Testing Devices (Pf)Inspector note: Test strips for quats sanitizer but chlorine is sanitizing chemical. Provide Chlorine test strips for testing sanitizer concentration.
-
Handwashing Cleanser Availability (Pf)Inspector note: No hand soap at bar hand sink. Provide soap.
-
Hand Drying Provision (Pf)Inspector note: No towels at bar hand sink. Provide towels.
-
Temperature Measuring Devices-Functionality (C)Inspector note: Bar refrigerators without thermometers. Provide internal thermometers for all refrigeration units.
-
Toilet Room Receptacle Covered (C)Inspector note: No covered waster bins in bathrooms. Provide covered trash receptacles in all bathrooms.
-
Outer Openings Protected (C)Inspector note: Exterior door to basement with daylight at base. Provide door sweep to prevent pests from entering.
Browse this restaurant's inspections
More restaurants in Leather District
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.