✓
La Abundancia Bakery Corporation
December 2, 2025 · Pass
😇clean
- official resultPass
- resultPass
- inspection typeEating & Drinking w/ Take Out
- failed findings0
- critical findings0
✓ No failed findings were recorded; 10 code checks were marked passed.
Checks marked passed
-
(A)(1) Time/Temperature Control for Safety Food Hot and Cold Holding (P)criticalInspector note: Noted Chicken and Beef empanadas at 110F in the hot holding unit cooked an hour ago.Remove COS by the PIC
-
(A)-(P) Person-In-Charge-Duties (Pf)Inspector note: Provide valid allergen certificate.
-
Sanitizing Solutions Testing Devices (Pf)Inspector note: Provide irrversible thermometer for high temp dish machine.
-
(A) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (Pf)Inspector note: Freezer chest in the basement has visible rust.Clean Visible dust and black spots on the fan and around it.Clean
-
In-Use Utensils Between-Use Storage (C)Inspector note: Noted scoops in the bulk food containers stored in contact with the food.Remove and store properly
-
Wiping Cloths Use Limitation (C)Inspector note: Noted dirty cloths stored on the rag.Remove and store in a sanitizer
-
Miscellaneous Sources of Contamination (C)Inspector note: Remove the condensation pipe from the 3 bay sink in the basement.
-
Maintaining Refuse Areas and Enclosures (C)Inspector note: Noted lot of clutter and overgrown grass in the trash area.Clean and remove innecessary items to prevent harborage of pest.
-
Cleaning Ventilation Systems Nuisance and Discharge Prohibition (C)Inspector note: Noted hood sticker expired Nov 20th 2025.Service Hood filters dirty with grease.Clean
-
flagged at inspectionInspector note: Noted no allergen certificate available during the inspection.Provide
What changed since the previous inspection?
Compared with Fail on November 25, 2025: 10 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in North End
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.