✕
Mc Goo's Pizza
July 10, 2025 · Fail
😬mid
- official resultFail
- resultFail
- inspection typeEating & Drinking w/ Take Out
- failed findings5
- critical findings0
Failed findings
-
(A) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (Pf)Inspector note: Slicer with dried up food debris. Can opener with dried up food debris. -- Clean and sanitize properly
-
Nonfood Contact Surfaces (C)Inspector note: Storage shelf near dough mixer soiled. Clean properly.
-
Floors Walls and Ceilings-Cleanability (C)Inspector note: Floor at lower level with several damaged tiles. Repair. Ceiling in the lower level missing several ceiling tiles. Replace.
-
Maintaining Premises Unnecessary Items and Litter (C)Inspector note: Large amount of not in use soiled equipment piled up at the lower level. Clean sanitize and store properly or Remove.
-
Cleaning Floors Dustless Methods (C)Inspector note: Floor at the flour storage area very soiled. Clean properly.
Checks marked passed
-
System Maintained in Good Repair (P)criticalInspector note: Observed a bucket to catch water leaking under the 3 compartment sink.Repair and provide a plumbers report from a licensed plumber.
-
Handwashing Cleanser Availability (Pf)Inspector note: Handsink missing hand soap. Provide at all times
-
Hand Drying Provision (Pf)Inspector note: Handsink missing paper towels. Provide
-
(B) and (C) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (C)Inspector note: Observed food spills inside of multiple refrigeration units. Clean to remove
-
Controlling Pests (C)Inspector note: Observed heavy activity of rodent droppings in the basement. Clean to remove and provide an updated pest control report via email. shemica.debnam@boston.gov
What changed since the previous inspection?
Compared with Pass on January 17, 2025: 5 findings appeared for the first time.
Browse this restaurant's inspections
More restaurants in South Boston
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.