✕
Oliveiras Express - Tivoli Catering
February 6, 2026 · Fail
🪳cooked
- official resultFail
- resultFail
- inspection typeEating & Drinking w/ Take Out
- failed findings9
- critical findings1
Failed findings
-
Manual and Mechanical Warewashing Equipment Chemical Sanitization-Temperature pH Concentration and Hardness (P)criticalInspector note: Observed sanitizer recorded 0PPM with the sanitizer strip.Repair the dispenser
-
Using a Handwashing Sink-Operation and Maintenance (Pf)Inspector note: Remove all the brooms and other items from the hand sink area to provide easy access for the staff to wash hands
-
Controlling Pests (Pf)Inspector note: Mice droppings in the basement behind the freezer and behind the prep table in the basement.Clean and provide detail pest report
-
Effectiveness-Hair Restraints (C)Inspector note: Staff not wearing hair restraint while dispensing and prepping food.Provide
-
Wiping Cloths Use Limitation (C)Inspector note: Observed soiled cleaning cloth on the prep area.Remove and store in a sanitizer when soiled
-
Maintaining Refuse Areas and Enclosures (C)Inspector note: Observed unnecessary items stored in the trash area.Remove to provide easy access to the pest technician and to elimate harborage for the pest
-
Outer Openings Protected (C)Inspector note: Repair the whole on the floor next to the front food dispensing area and also at the back door frame.
-
Cleaning Frequency and Restrictions (C)Inspector note: Noted soiled floors behind the storage shelves for food and dry items.Clean to remove all food items on the floor which provides a food source for the pest.
-
Cleaning Ventilation Systems Nuisance and Discharge Prohibition (C)Inspector note: Filters heavily soiled in the hood.Clean with frequency
What changed since the previous inspection?
Compared with Pass on December 12, 2025: 9 findings appeared for the first time.
Browse this restaurant's inspections
More restaurants in Beacon Hill
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.