✕
Omni Parker House
September 21, 2011 · Fail
😬mid
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings2
- critical findings0
Failed findings
-
Improper Maintenance of FloorsInspector note: Floor in bakery is in need of regrouting.Chief engineer has stated that an action plan is in process to remedy.
-
premises not properly maintained or cleanedOfficial wording: Improper Maintenance of Walls/CeilingsInspector note: Wall area behind a heat pump in Bakery is worn and needs repair.A few ceramic wall tiles in Bakery also need to be replaced.An action plan is in process as stated by Chief engineer to repair.(OK).Some wall attachments in Bakery need to be cleaned(Dusted).Wall in kitchen by front entrance to DR is worn and needs to be repaired/replaced.Hotline hood greasy(Clean).Ceiling area over dishroom is worn.Resurface as well as ceiling over handsink in dishroom.Remove duct tape from insulation on overhead pipes in bakery.
What changed since the previous inspection?
Compared with Pass on March 22, 2011: 2 findings appeared for the first time.
Browse this restaurant's inspections
More restaurants in Downtown
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.