✕
Omni Parker House
December 17, 2018 · Fail
😬mid
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings4
- critical findings0
Failed findings
-
Installed and MaintainedInspector note: repair faucet to the hand sink on the hot line. Eamployees are washing thier hands at other hand sinks until the hjand sink is repaired.
-
Floors Designed Constructed InstalledInspector note: Raepair damaged floor area outside of the dishroom leading to the back area.
-
Improper Maintenance of FloorsInspector note: Clean floor area of trash room. Remove buildup of debris on floor area.
-
premises not properly maintained or cleanedOfficial wording: Improper Maintenance of Walls/CeilingsInspector note: replace missing wall tiles on wall outside of walk in cooler near back area of the kitchen. Clean pipes running aloing walls at the begining of the dish machine. Also remove flaking paint from pipes and the surrounding ceiling above the dish machine. Ceiling of the kettle isle has flaking paint. Remove flaking paint and reseal as needed. Repair damaged ceiling along the entrance of the dry goods storage area. Also repair ceilings as needed inside the dry goods storage room. Repair ceiling area in the mens locker room. Ceiling is faling apart and in disrepair.
What changed since the previous inspection?
Compared with Pass on September 11, 2018: 4 findings appeared for the first time.
Browse this restaurant's inspections
More restaurants in Downtown
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.