Shabu Maru

January 28, 2022 · Fail
🪳cooked
  • official resultFail
  • resultFail
  • inspection typeEating & Drinking
  • failed findings4
  • critical findings1

← Back to the current restaurant page

Failed findings

  • (A)(1) Time/Temperature Control for Safety Food Hot and Cold Holding (P)critical
    Inspector note: Mushroom soup in hot holding unit at 104F. Person in charge indicated it was placed cold in hot holding unit and left to heat there. Discussed with person in charge to have a better practice to heat soup in kettle to 165F prior to moving to hot holding unit. Person in charge corrected.
    code 590.003/3-501.16-P1*** · critical food-safety factorstatus: Fail
  • Ready-To-Eat Time/Temperature Control for Safety Food Date Marking (Pf)
    Inspector note: Multiple food items that are held for multiple days without date marking. Provide for foods being held over 24 hours.
    code 590.003/3-501.17-PF** · serious findingstatus: Fail
  • Hand Drying Provision (Pf)
    Inspector note: No paper towels available at bar hand sink. Person in charge corrected on site.
    code 590.006/6-301.12-PF** · serious findingstatus: Fail
  • System Maintained in Good Repair (C)
    Inspector note: Sanitizer dispenser button is broken. Repair.
    code 590.005/5-205.15-C* · lower-severity findingstatus: Fail

What changed since the previous inspection?

Compared with Pass on October 20, 2021: 4 findings appeared for the first time.

Browse this restaurant's inspections

About this record

This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Analyze Boston.

official city health-inspection data · no account, no sign-up