Cooked?

Shake Shack

March 23, 2026 · Fail
🪳cooked
  • official resultFail
  • resultFail
  • inspection typeEating & Drinking
  • failed findings2
  • critical findings1

← Back to the current restaurant page

Failed findings

  • (A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)critical
    Inspector note: Shredded Lettuce and slice tomato were observed stored on a true sandwich prep unit with an internal temparture of 46F. Provide proper cold Holding of 41F or Below ( PIC voluntarily relocated itmes to the walk-in cooler for rapid cooling).
    code 590.003/3-501.16-P*** · critical food-safety factorstatus: Fail
  • Warewashing Machines Temperature Measuring Devices (Pf)
    Inspector note: There is no irreversible thermometer for the high temp dishwasher available. Provide an irreversible thermometer (gauges were reading wash 160F and rinse 180F.
    code 590.004/4-204.115-PF** · serious findingstatus: Fail

What changed since the previous inspection?

Compared with Pass on December 12, 2025: 2 findings appeared for the first time.

Browse this restaurant's inspections

About this record

This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Analyze Boston.

official city health-inspection data · no account, no sign-up