✓
Soup Shack
January 9, 2025 · Pass
😇clean
- official resultPass
- resultPass
- inspection typeEating & Drinking
- failed findings0
- critical findings0
✓ No failed findings were recorded; 8 code checks were marked passed.
Checks marked passed
-
Temperature Measuring Devices Manual and Mechanical Warewashing (Pf)Inspector note: Irreversiable measuring device will need new batteries.
-
Using a Handwashing Sink-Operation and Maintenance (Pf)Inspector note: One of the hand sinks on the cooking line was blocked with equipment. Discontinue and review with staff not to block sinks and to wash hands more often
-
Miscellaneous Sources of Contamination (C)Inspector note: In basement prep area found staff cutting vegetables with the trash can being used as a table. Discontinue and provide another prep table.
-
Thawing (C)Inspector note: In basement found to containers of raw frozen foods thawing at room temperature. Review with staff to thaw the day before under running water and cook frozen.
-
Ventilation Hood Systems Filters (C)Inspector note: PIC will need to clean hood filters on cooking line. Hood sticker good until Feb 2025
-
(A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)Inspector note: In basement prep area found the hose to provide the sanitizer to short to reach the sanitizer bay. Please replace and review with staff to wash rinse and sanitizer in the three bays.
-
Floors Walls and Ceilings-Cleanability (C)Inspector note: Pic will need to clean the floor under and behind cooking equipment and in basement along walls and under refrigeration.
-
Wall and Ceiling Coverings and Coatings (C)Inspector note: As discussed please replace the ceiling tiles in the basement above equipment.
What changed since the previous inspection?
Compared with Fail on January 2, 2025: 8 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in Jamaica Plain
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.