✕
Symphony Sushi
June 11, 2020 · Closed by the city
🪳cooked
- official resultClosed by the city
- inspection typeEating & Drinking
- failed findings5
- critical findings1
Failed findings
-
System Maintained in Good Repair (P)criticalInspector note: No hot water avilable upon inspection.PIC states that hot water tank broke during the night.PIC voluntarily closed the establishment. Ensure repairs are completed to hot water tank & be re-inspected before receiving OK to re-open.
-
(A)-(P) Person-In-Charge-Duties (Pf)Inspector note: No hot water in the establishment establishment operating upon inspection. Principal Health Inspector Dan Prendergast was notified. Establishment agreed to Voluntarily close complete repairs be re-inspected the next business day before OK to re-open.
-
Mechanical Warewashing Equipment Wash Solution Temperature (Pf)Inspector note: Low temp dish machine Wash/rinse temps 60-70f.Repair Maintain wash/rinse temps 120-140f or per manufactures instructions.
-
Using a Handwashing Sink-Operation and Maintenance (Pf)Inspector note: Hand wash sink observed blocked by utensils/equipment.Maintain handwash sinks accessible to ensure proper handwashing is available.
-
Floors Walls and Ceilings-Cleanability (C)Inspector note: Clean to remove evidence of mouse dropping from basement floor. Kitchen:Clean floors under storage rack next to 2 door upright refrigeration unit to remove soils.
What changed since the previous inspection?
Compared with Pass on October 28, 2019: 5 findings appeared for the first time.
Browse this restaurant's inspections
More restaurants in South End
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.