✕
The Broadway Restaurant
March 13, 2021 · Fail
🪳cooked
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings8
- critical findings1
Failed findings
-
System Maintained in Good Repair (P)criticalInspector note: Floor drain observed backing up into dish room.Repair Plumber is observed on site repair in progress. PIC instructed to forward licensed plumbers report. Clean & sanitizer location upon completion of the repair Assistant Commissioner Dan Prendergast notified
-
(A)-(P) Person-In-Charge-Duties (Pf)Inspector note: Manager to re-train staff to have proper supplies at all necessary handwash stations check daily.
-
(A) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (Pf)Inspector note: Interior white panel of the large ice machine observed with soils.Clean to remove soils. Bars: 2 low temp dish machines not reading chlorine.Repair. Maintain chlorine 50PPM or per manufactures instructions. Alternate machine to be used at the bar until repairs ar complete.
-
Using a Handwashing Sink-Operation and Maintenance (Pf)Inspector note: 2 handwash sinks observed obstructed.Clear obstruction maintai accessible to ensure proper handwashing can be completed. PIC corrected
-
Hand Drying Provision (Pf)Inspector note: multiple handwash stations missing paper towels.Provide PIC correcting
-
Food Storage Containers Identified with Common Name of Food (C)Inspector note: Provide labels on all bulk storage containers.
-
(B) and (C) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (C)Inspector note: Clean the interior of the flash freezer to remove spills.
-
System Maintained in Good Repair (C)Inspector note: Handwash sink across from the expiditing line observed loose.Repair
What changed since the previous inspection?
Compared with Pass on September 10, 2020: 8 findings appeared for the first time.
Browse this restaurant's inspections
More restaurants in South Boston
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.