Uno Due Go

October 2, 2019 · Fail
😬mid
  • official resultFail
  • resultFail
  • inspection typeEating & Drinking
  • failed findings4
  • critical findings0

← Back to the current restaurant page

Failed findings

  • Hand Drying Provision (Pf)
    Inspector note: Repair broken paper towel disenser at the pizza prep area. Provide paper towels for the hand sink on the cold service line.
    code 590.006/6-301.12-PF** · serious findingstatus: Fail
  • Cutting Surfaces (C)
    Inspector note: Resurface or replace scoured and stained cutting boad to the cold unit on the service line.
    code 590.004/4-501.12-C* · lower-severity findingstatus: Fail
  • Nonfood Contact Surfaces (C)
    Inspector note: Clean exterior of the ice machine in the kitchen. Remove all non ice related materials stored on top of the ice machine.
    code 590.004/4-602.13-C* · lower-severity findingstatus: Fail
  • Floors Walls and Ceilings-Cleanability (C)
    Inspector note: Keep supplis 6 inches off the floor. Clean the floor area under the dough storage racks next to the ovens in the kitchen.
    code 590.006/6-201.11-C* · lower-severity findingstatus: Fail

What changed since the previous inspection?

Compared with Pass on May 29, 2019: 4 findings appeared for the first time.

Browse this restaurant's inspections

About this record

This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Analyze Boston.

official city health-inspection data · no account, no sign-up