✓
Carver Den
August 28, 2026 · Pass
😇clean
- official resultPass
- resultPass
- inspection typeEating & Drinking
- failed findings0
- critical findings0
✓ No failed findings were recorded; 4 code checks were marked passed.
Checks marked passed
-
(A)-(P) Person-In-Charge-Duties (Pf)Inspector note: Violations noted on the inspection report. PIC to provide active managerial controls and train staff on violations noted on the inspection report
-
Sanitizing Solutions Testing Devices (Pf)Inspector note: PIC unable to provide sanitzer test strips. Inspector test strips was used to record sanitizer concentration
-
Capacity-Quantity and Availability (Pf)Inspector note: Observed hot water in the kitchen fluctuating between 60F-108F . Repair to meet peak period
-
System Maintained in Good Repair (C)Inspector note: Kitchen main hansink observed leaking (pipe under) Repair
What changed since the previous inspection?
Compared with Fail on August 22, 2026: 4 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in Mattapan
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.