✕
China Sky Restaurant
June 21, 2016 · Fail
🪳cooked
- official resultFail
- resultFail
- inspection typeEating & Drinking w/ Take Out
- failed findings5
- critical findings2
Failed findings
-
PIC KnowledgecriticalInspector note: PROVIDE A FULL TIME SERVE SAFE MANAGER...
-
Consumer AdvisoriescriticalInspector note: PROVIDE ALLERGIN CERT.
-
Food ProtectionInspector note: REMOVE TOWELS STORED ON ALL REFRIGERATED FOODS...
-
Food Contact Surfaces DesignInspector note: REPLACE ALL DEFECTIVE EQUIPMENT AND PROVIDE NSF FOOD GRADE COVERINGS NOT TOWELS....REPLACE ALL SCORED CUTTING BOARDS....
-
Non-Food Contact SurfacesInspector note: REPLACE MISSING COMPRESSOR COVERS AND MISSING FAN COVER AT REACHIN...RESEAL ALL RUSTY SHELVING ....REPLACE ALL DEFECTIVE DOORGASKETS....
Checks marked passed
-
Hot and Cold WatercriticalInspector note: PROVIDE HOT AND COLD RUNNING WATER AT EMPLOYEE REST ROOM SINK...
-
Insects Rodents AnimalsInspector note: EVIDENCE OF MICE ROACHES AND FRUITFLIES..PROVIDE PEST CONTROL REPORT....
-
Non-Food Contact Surfaces CleanInspector note: CLEAN ALL GREASE ENCRUSTED EQUIPMENT....CLEAN ALL SHELVING THROUGHOUT....CLEAN ALL REACHINS AND WALKINS....CLEAN ALL SINKS THROUGHOUT...
-
Installed and MaintainedInspector note: ADJUST LOOSE FAUCET IN RESTROOM.....REPAIR LEAKY HANDSINK AT WAREWASHING AREA....REPAIR LEAKY FAUCETS AT 3 COMP.SINK...
-
Improper Maintenance of FloorsInspector note: CLEAN FLOOR IN WALKINS AND UNDER ALL EQUIPMENT....
-
premises not properly maintained or cleanedOfficial wording: Improper Maintenance of Walls/CeilingsInspector note: CLEAN ALL WALLS AND CEILING THROUGHOUT KITCHEN AND WALKINS....CLEAN INTERIOR OF HOOD....
-
Premises MaintainedInspector note: REMOVE IN CELLAR ALL UNNECESSARRY ARTICLES....
What changed since the previous inspection?
Compared with Fail on June 14, 2016: 5 findings recurred. 7 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in Dorchester
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.