✕
Clover
March 1, 2023 · Fail
😬mid
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings2
- critical findings0
Failed findings
-
Cooling Heating and Holding Capacities-Equipment (Pf)Inspector note: Production line sandwich unit not working. Ice being used on top line. All items on top line are in acceptable range. Temperature logs provided. Work order has been placed. Repair unit as necessary.
-
(A) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (Pf)Inspector note: Observed ice machine with soils inside the interior. Clean to remove.
What changed since the previous inspection?
Compared with Pass on December 12, 2022: 2 findings appeared for the first time.
Browse this restaurant's inspections
More restaurants in Downtown
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.