Cooked?

Hao Shi Guang

July 29, 2022 · Fail
😬mid
  • official resultFail
  • resultFail
  • inspection typeEating & Drinking
  • failed findings2
  • critical findings0

← Back to the current restaurant page

Failed findings

  • Floors Walls and Ceilings-Cleanability (C)
    Inspector note: In the basement prep kitchen drain pipes run along the ceiling. Provide covering for the exposed pipes to ensure that the ceiling surface is smooth and durable. Remove 2 chest freezers stored below the exposed pipes and do not conduct any food prep below the pipes.
    code 590.006/6-201.11-C* · lower-severity findingstatus: Fail
  • Wall and Ceiling Coverings and Coatings (C)
    Inspector note: Ceiling to the left of the basement prep room is not finished and the framework is exposed. Provide a sealed prep room ceilikng that is smooth durable mom porus and easy to clean.
    code 590.006/6-201.16-C* · lower-severity findingstatus: Fail

Browse this restaurant's inspections

About this record

This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Analyze Boston.

official city health-inspection data · no account, no sign-up