Cooked?

Hao Shi Guang

August 10, 2022 · Fail
😬mid
  • official resultFail
  • resultFail
  • inspection typeEating & Drinking
  • failed findings1
  • critical findings0

← Back to the current restaurant page

Failed findings

  • Floors Walls and Ceilings-Cleanability (C)
    Inspector note: In the basement prep kitchen drain pipes run along the ceiling. Provide covering for the exposed pipes to ensure that the ceiling surface is smooth and durable. Remove 2 chest freezers stored below the exposed pipes and do not conduct any food prep below the pipes. PIC reports construction delays with this project. Continue to not store any food items under the drain pipe and do not conduct any food prep below the exposed drain pipe. PIC estimated work will be completed on 8-20-2022.
    code 590.006/6-201.11-C* · lower-severity findingstatus: Fail

Checks marked passed

  • Wall and Ceiling Coverings and Coatings (C)
    Inspector note: Ceiling to the left of the basement prep room is not finished and the framework is exposed. Provide a sealed prep room ceilikng that is smooth durable mom porus and easy to clean.
    code 590.006/6-201.16-C* · lower-severity findingstatus: Pass

What changed since the previous inspection?

Compared with Fail on July 29, 2022: 1 finding recurred. 1 previous finding did not recur.

Browse this restaurant's inspections

About this record

This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Analyze Boston.

official city health-inspection data · no account, no sign-up