✕
Natif Natal Restaurant
August 5, 2019 · Fail
😬mid
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings12
- critical findings0
Failed findings
-
(A)-(P) Person-In-Charge-Duties (Pf)Inspector note: Person in charge not performing duties must maintain a daily cleaning schedule and review temperatures.
-
Ready-To-Eat Time/Temperature Control for Safety Food Date Marking (Pf)Inspector note: No date marking for foods held more than 24hrs.
-
Food Temperature Measuring Devices (Pf)Inspector note: No working food thermometer.
-
Controlling Pests (Pf)Inspector note: Evidence of mice droppings on storage shelving.
-
Food Storage-Preventing Contamination from the Premises (C)Inspector note: Foods observed with no covers inside refrigerators.
-
Nonfood-Contact Surfaces (C)Inspector note: Condensation water from refrigerator unit pooling into pan.
-
Temperature Measuring Devices-Functionality (C)Inspector note: 2 door upright unit thermometer broken. no thermometer for hot holding cabinet.
-
(B) and (C) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (C)Inspector note: Clean all cooking equipment sides inbetween backsplash to remove heavy thick build up of grease. Clean inside and exterior refrigeration units and storage shelving.
-
Nonfood Contact Surfaces (C)Inspector note: Develop a cleaning schedule handle high build up of grease and soil.
-
System Maintained in Good Repair (C)Inspector note: Pipe exposed to the exterior grounds repair.
-
Floors Walls and Ceilings-Cleanability (C)Inspector note: Repair or replace all soiled and broken ceiling tiles.
-
Intensity-Lighting (C)Inspector note: lighting not adequate at dining room kitchen and basement area.
What changed since the previous inspection?
Compared with Fail on August 4, 2019: 12 findings appeared for the first time. 3 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in Roxbury
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.