✕
Piattini
June 25, 2026 · Fail
🪳cooked
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings1
- critical findings1
Failed findings
-
Backflow Prevention (P)criticalInspector note: Upon reinspection work has been done at the prep sink but no permit has been given by a City Plumber; have your licensed plumber pull proper permits and have their work inspected and approved by a City Plumber and provide the permit to damien.yee@boston.gov
Checks marked passed
-
Temperature Measuring Devices Manual and Mechanical Warewashing (Pf)Inspector note: No irreversible for the high temperature warewashing machine at the bar could be presented during the inspection; provide an irreversible thermometer.
-
Using a Handwashing Sink-Operation and Maintenance (Pf)Inspector note: During the reinspection observed a new violation at the bar where a perforated hotel pan is stored inside the handwashing sink basin with used bottle corks and bottle caps inside the perforated hotel pan. Retrain staff that handwashing sinks are for hand washing only.
What changed since the previous inspection?
Compared with Fail on June 17, 2026: 1 finding appeared for the first time. 2 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in Back Bay
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.