✓
S & I To Go
July 22, 2019 · Pass
😇clean
- official resultPass
- resultPass
- inspection typeEating & Drinking w/ Take Out
- failed findings0
- critical findings0
✓ No failed findings were recorded; 8 code checks were marked passed.
Checks marked passed
-
Food Contact with Equipment Utensils and Linens (P)criticalInspector note: Bottle of sauce placed on food items. PIC removed it. Store away from food.
-
(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)criticalInspector note: Sandwich Refrigerating Unit- Pork Belly 54F Chicken 55F. Both food item stored on containers at the top of unit above other food items. Unit registered 38F. PIC stated they had just put the food for cooking and placed it in another unit. Maintain all TCS foods at 41F or below.
-
(A)-(P) Person-In-Charge-Duties (Pf)Inspector note: Ensure that staff is properly trained with regard to proper cold holding and food storage.
-
(A) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (Pf)Inspector note: Ice machine interior soiled. Clean and sanitize properly.
-
In-Use Utensils Between-Use Storage (C)Inspector note: Observed knifes soiled stored at the clean knife storage box. Store properly and clean/sanitize properly before storing away.
-
Nonfood-Contact Surfaces (C)Inspector note: Card boards (some soiled) being used to cover shelves at cooking line. Discontinue. Use cleanable and durable surfaces.
-
Nonfood Contact Surfaces (C)Inspector note: Exterior side (between) of equipment at the cooking line soiled with grease. Clean properly.
-
Cleaning Frequency and Restrictions (C)Inspector note: Floor under and around cooking line soiled. Wall and pipes behind cooking line soiled. Hood vent with grease and dust. Clean all properly.
What changed since the previous inspection?
Compared with Fail on July 15, 2019: 8 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in Allston
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.