✕
Sam Adams Deck/Rf Roof
March 31, 2014 · Fail
😬mid
- official resultFail
- resultFail
- inspection typeEating & Drinking
- failed findings2
- critical findings0
Failed findings
-
Cross Connection Back Siphonage BackflowInspector note: Spray arm of the 3 bay sink hangs below the fill line. Ensure spray arm hangs above the fill line of the 3 bay sink.
-
Installed and MaintainedInspector note: Pipe under the hand sink near beer stations leaking. Repair.
What changed since the previous inspection?
Compared with Pass on April 8, 2013: 2 findings appeared for the first time.
Browse this restaurant's inspections
More restaurants in Fenway
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.