The Great American Bagel (T3 K2)

May 17, 2019 · Pass
😇clean
  • official resultPass
  • resultPass
  • inspection typeCanvass
  • failed findings4
  • critical findings1

← Back to the current restaurant page

Failed findings

  • handwashing sink blocked or barecritical
    Official wording: Adequate Handwashing Sinks Properly Supplied And Accessible
    Inspector note: NO HAND WASHING SIGNAGE AT HAND SINK LOCATED NEXT TO COFFEE PREPARATION AREA.INSTRUCTED TO PROVIDE AND MAINTAIN PROPER HAND WASHING SIGNAGE.
    code 10Priority
  • surfaces / setup not up to code
    Official wording: Food & Non-Food Contact Surfaces Cleanable, Properly Designed, Constructed & Used
    Inspector note: OBSERVED TORN GASKETS IN FRONT PREP 3 DOOR COOLER.INSTRUCTED TO REPLACE TORN GASKETS FOR MENTIONED COOLER AND TO MAINTAIN.
    code 47
  • Sewage & Waste Water Properly Disposed
    Inspector note: INSTRUCTED TO REMOVE ACCUMULATION OF RUSTS ON EXTERIORS OF GREASE TRAP BOX UNDERNEATH THE DISH WASHING 3 COMPARTMENT SINK AND TO MAINTAIN.
    code 52
  • floors, walls, or ceilings grimy
    Official wording: Physical Facilities Installed, Maintained & Clean
    Inspector note: OBSERVED DAMAGED CORNER BASEBOARD FROM WALL LOCATED IN REAR STORAGE ROOM ACROSS FROM STAND-UP 2 DOOR COOLER.INSTRUCTED TO REPAIR TO CORNER BASEBOARD AT MENTIONED AREA AND TO MAINTAIN. • OBSERVED DIRTY FLOORS UNDER AND AROUND UNDERNEATH THE REAR DISH WASHING 3 COMPARTMENT SINK AREAS.INSTRUCTED TO DETAIL CLEAN AND TO BETTER MAINTAIN.
    code 55

What changed since the previous inspection?

Compared with Pass w/ Conditions on October 11, 2018: 4 findings appeared for the first time. 2 previous findings did not recur.

Browse this restaurant's inspections

About this record

This record comes from Chicago Department of Public Health. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.

Source: Chicago Data Portal.

official city health-inspection data · no account, no sign-up