✕
Lucca North End
March 17, 2025 · Closed by the city
🪳cooked
- official resultClosed by the city
- inspection typeEating & Drinking
- failed findings5
- critical findings1
Failed findings
-
Discarding or Reconditioning Unsafe Adulterated or Contaminated Food (P)criticalInspector note: Multiple food items possibly exposed to sewage water & loss of power from the flooding. Contact ISD Health to discuss a food condemnation with a supervisor.
-
(A)-(P) Person-In-Charge-Duties (Pf)Inspector note: Sewage flood in the establishment Food items possibly affected & water damage throughout basement /kitchen Power was shut off by BFD @ approx 3:30am Upon my arrival I could not gain access due to 4-8 inches of standing water inside the location Assistant Commissioner Dan Prendergast notified. Voluntary closure issued. PIC Instructed to provide all necessary repairs clean/sanitize/disinfect using a professional licensed restoration company provide all documentation be re-inspected by Plumbing electrical & health for approval to re-open.
-
Nonfood Contact Surfaces (C)Inspector note: Clean/sanitize/disinfect all exposed equipment.counters.tables wares ect... Provide all cleaning documents be re-inspected for approval to re-open.
-
Floors Walls and Ceilings-Cleanability (C)Inspector note: Remove all standing water Clean/sanitize/disinfect the location throughout(sewage flood in the establishment basement) Provide all cleaning documentation to the Health Department.
-
Repairing-Premises Structures Attachments and Fixtures-Methods (C)Inspector note: Provide all necessary repairs to damaged equipment/restroom as needed. Provide repair documentation to the health depaertment.
What changed since the previous inspection?
Compared with Fail on March 13, 2025: 5 findings appeared for the first time. 9 previous findings did not recur.
Browse this restaurant's inspections
More restaurants in North End
About this record
This record comes from Boston Inspectional Services, Health Division. Cooked keeps the official result and wording separate from its plain-English explanation so you can verify what the inspector actually published.
Source: Analyze Boston.