Gomez Lounge Inc is currently Fail from Chicago Department of Public Health, from an inspection on January 14, 2010. No critical violations were recorded at that visit. On Cooked's ladder that reads cooked 🪳.
What did inspectors find at Gomez Lounge Inc?
These are the violations recorded at the most recent inspection on January 14, 2010, in plain English, with the city's own wording underneath.
⚠️Food And Non-Food Contact Surfaces Properly Designed, Constructed And Maintained • All food and non-food contact equipment and utensils shall be smooth, easily cleanable, and durable, and shall be in good repair. ALL RAW WOOD SHELVES MUST BE PAINTED.
Food And Non-Food Contact Surfaces Properly Designed, Constructed And Maintained • All food and non-food contact equipment and utensils shall be smooth, easily cleanable, and durable, and shall be in good repair. ALL RAW WOOD SHELVES MUST BE PAINTED.
🧫food prep surfaces dirty
Food And Non-Food Contact Equipment Utensils Clean, Free Of Abrasive Detergents • All food and non-food contact surfaces of equipment and all food storage utensils shall be thoroughly cleaned and sanitized daily. CLEAN COOLERS,SHELVES & SINKS.
⚠️Floors: Constructed Per Code, Cleaned, Good Repair, Coving Installed, Dust-Less Cleaning Methods Used • The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. REPAIR/REPLACE BROKEN FLOOR TILES AND DETAIL CLEAN FLOORS ALONG WALL BASES AND IN CORNERS THROUGHOUT WHERE NEEDED.
Floors: Constructed Per Code, Cleaned, Good Repair, Coving Installed, Dust-Less Cleaning Methods Used • The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. REPAIR/REPLACE BROKEN FLOOR TILES AND DETAIL CLEAN FLOORS ALONG WALL BASES AND IN CORNERS THROUGHOUT WHERE NEEDED.
⚠️Walls, Ceilings, Attached Equipment Constructed Per Code: Good Repair, Surfaces Clean And Dust-Less Cleaning Methods • The walls and ceilings shall be in good repair and easily cleaned. FINISH SEALING ALL CRACKS IN WALLS. PAINT WALLS BY MOP SINK AND IN WASHROOMS WHERE NEEDED. REPLACE MISSING WALL COVINGS.
Walls, Ceilings, Attached Equipment Constructed Per Code: Good Repair, Surfaces Clean And Dust-Less Cleaning Methods • The walls and ceilings shall be in good repair and easily cleaned. FINISH SEALING ALL CRACKS IN WALLS. PAINT WALLS BY MOP SINK AND IN WASHROOMS WHERE NEEDED. REPLACE MISSING WALL COVINGS.
🪳pests in the house
Ventilation: Rooms And Equipment Vented As Required: Plumbing: Installed And Maintained • The flow of air discharged from kitchen fans shall always be through a duct to a point above the roofline. REPLACE BROKEN LID TO TOILET IN WOMEN'S WASHROOM
When was Gomez Lounge Inc last inspected?
Gomez Lounge Inc has 2 inspections on record going back to January 14, 2010.
date
result
score
December 13, 2012
closed by the city
January 14, 2010
Fail
Gomez Lounge Inc vs New City
New City runs 64% clean across 490 tracked restaurants — 311 clean, 76 mid, 98 cooked.
Against the 490 spots Cooked tracks in New City, this one comes out cleaner than 16% of them.
Chicago does not use letter grades. Every inspection ends in one of three official results: Pass, Pass with Conditions, or Fail. Pass with Conditions means violations were found but corrected on the spot or under a deadline — the restaurant is open, with homework. A Fail means serious violations went uncorrected, and it usually brings a re-inspection within days. Chicago also flags “priority” violations, the ones most likely to actually make someone sick. Cooked reads Pass as clean, Pass with Conditions as mid, and Fail as cooked, and shows the itemized violations behind each result.
Source: Chicago Department of Public Health via Chicago Data Portal. Cooked refreshes this data daily — this listing's most recent inspection is dated January 14, 2010. Inspection results describe one moment in a kitchen's life, not a permanent verdict.